| Assessment Year | 2004 |
|---|---|
| Principal Product | conveyors and assembly lines |
| NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 197 |
| Plant Area |
70,000
ft2
|
| Annual Production | 50
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,361 | 1,223,600 |
kWh
|
$0.047 |
| Electricity Demand | $17,773 | 3,672 |
kW-mo/yr
|
$4.84 |
| Natural Gas | $37,054 | 3,589 |
MMBtu
|
$10.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,402 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,721 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $703 | $290 |
$501
14,272
kWh
|
$202
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $197 | $25 |
$139
3,978
kWh
|
$58
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $647 | $985 |
$457
13,049
kWh
|
$190
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $967 | $4,398 |
$661
18,879
kWh
|
$306
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $207 | $732 |
$207
5,925
kWh
|
- | - | |
| 06 | 2.7231: Use radiant heater for spot heating | $11,055 | $14,814 | - | - |
$11,055
-
MMBtu
|
|
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $626 | $1,600 | - | - |
$626
-
MMBtu
|
|
| TOTAL RECOMMENDED | $14,402 | $22,844 |
$1,965
56,103
kWh
|
$756
-
kW-mo/yr
|
$11,681
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,721 | $6,430 |
$1,965
56,103
kWh
|
$756
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs