ITAC Assessment: IA0348
ITAC logo
ITAC Assessment: IA0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product paving and construction equipment
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 350,000
ft2
Annual Production 2,250
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,461 7,303,900
kWh
Electricity Demand $165,719 20,808
kW-mo/yr
Natural Gas $197,290 28,714
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $9,818 $10,704 - - $9,818 - -
02 2.4323: Use optimum size and capacity equipment $1,336 $475 $841
27,300
kWh
$495
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $651 $146 $410
13,309
kWh
$241
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,888 $535 $2,697
87,413
kWh
$1,591
-
kW-mo/yr
- - $(-400.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,829 $14,216 $2,158
70,044
kWh
$2,671
-
kW-mo/yr
- - -
06 2.1213: Direct warmest air to combustion intake $193 $438 - - - $193
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $383 $120 $176
5,706
kWh
$207
-
kW-mo/yr
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,653 $4,596 $1,648
53,508
kWh
$970
-
kW-mo/yr
- $14,035
-
MMBtu
-
TOTAL RECOMMENDED $37,751 $31,230 $7,930
257,280
kWh
$6,175
-
kW-mo/yr
$9,818 $14,228
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $35,839 $30,197 $6,913
224,274
kWh
$5,473
-
kW-mo/yr
$9,818 $14,035
-
MMBtu
$(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs