Assessment Year | 2004 |
---|---|
Principal Product | paving and construction equipment |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 700 |
Plant Area |
350,000
ft2
|
Annual Production | 2,250
pieces
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $224,461 | 7,303,900 |
kWh
|
$0.031 |
Electricity Demand | $165,719 | 20,808 |
kW-mo/yr
|
$7.96 |
Natural Gas | $197,290 | 28,714 |
MMBtu
|
$6.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,751 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,839 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $9,818 | $10,704 | - | - | $9,818 | - | - | |
02 | 2.4323: Use optimum size and capacity equipment | $1,336 | $475 |
$841
27,300
kWh
|
$495
-
kW-mo/yr
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $651 | $146 |
$410
13,309
kWh
|
$241
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,888 | $535 |
$2,697
87,413
kWh
|
$1,591
-
kW-mo/yr
|
- | - | $(-400.0) | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,829 | $14,216 |
$2,158
70,044
kWh
|
$2,671
-
kW-mo/yr
|
- | - | - | |
06 | 2.1213: Direct warmest air to combustion intake | $193 | $438 | - | - | - |
$193
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $383 | $120 |
$176
5,706
kWh
|
$207
-
kW-mo/yr
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,653 | $4,596 |
$1,648
53,508
kWh
|
$970
-
kW-mo/yr
|
- |
$14,035
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $37,751 | $31,230 |
$7,930
257,280
kWh
|
$6,175
-
kW-mo/yr
|
$9,818 |
$14,228
-
MMBtu
|
$(-400.0) | ||
TOTAL IMPLEMENTED | $35,839 | $30,197 |
$6,913
224,274
kWh
|
$5,473
-
kW-mo/yr
|
$9,818 |
$14,035
-
MMBtu
|
$(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs