ITAC Assessment: IA0337
ITAC logo
ITAC Assessment: IA0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product modular homes and ATM kiosks
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 172,700
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,703 1,278,660
kWh
Electricity Demand $34,588 4,812
kW-mo/yr
Natural Gas $74,103 9,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,090 $1,131 $1,108
28,338
kWh
$982
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,097 $757 $1,132
29,094
kWh
$965
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $151 $16 $80
2,047
kWh
$71
-
kW-mo/yr
- -
04 2.4321: Upgrade obsolete equipment $178 $16 $96
2,407
kWh
$82
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $196 $532 $196
5,021
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,587 $300 $848
21,746
kWh
$739
-
kW-mo/yr
- -
07 3.1191: Change procedures / equipment / operating conditions $11,525 $15,332 - - $9,400
-
lb
$2,125
TOTAL RECOMMENDED $17,824 $18,084 $3,460
88,653
kWh
$2,839
-
kW-mo/yr
$9,400
-
lb
$2,125
TOTAL IMPLEMENTED $5,774 $2,188 $3,088
79,178
kWh
$2,686
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs