Assessment Year | 2004 |
---|---|
Principal Product | Aluminum Casting Parts |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3363: Aluminum Die-Castings |
Sales Range | $50 M to 100M |
# of Employees | 378 |
Plant Area |
159,996
ft2
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $600,900 | 18,992,405 |
kWh
|
$0.032 |
Electricity Demand | $259,633 | 38,868 |
kW-mo/yr
|
$6.68 |
Electricity Fees | $17,413 | - |
|
- |
Natural Gas | $704,707 | 191,107 |
MMBtu
|
$3.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,312 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,405 | $25 |
$1,080
34,164
kWh
|
$325
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,625 | $474 |
$4,325
136,859
kWh
|
$1,300
-
kW-mo/yr
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $886 | $866 |
$875
27,675
kWh
|
$11
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,387 | $6,232 |
$1,781
56,376
kWh
|
$606
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,647 | $3,807 |
$4,295
136,165
kWh
|
$1,352
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $918 | $1,729 |
$918
29,049
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $11,767 | $12,275 | - | - |
$11,767
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $8,410 | $6,902 | - | - |
$8,410
-
MMBtu
|
|
09 | 2.2511: Insulate bare equipment | $1,097 | $198 | - | - |
$1,097
-
MMBtu
|
|
TOTAL RECOMMENDED | $38,142 | $32,508 |
$13,274
420,288
kWh
|
$3,594
-
kW-mo/yr
|
$21,274
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,312 | $23,654 |
$11,276
357,075
kWh
|
$3,269
-
kW-mo/yr
|
$11,767
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs