ITAC Assessment: IA0334
ITAC logo
ITAC Assessment: IA0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product printed advertisements
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 152,600
ft2
Annual Production 157,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $549,613 20,626,124
kWh
Electricity Demand $405,359 37,356
kW-mo/yr
Natural Gas $470,938 108,296
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $288,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,614 $583 $5,194
205,126
kWh
$2,420
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,911 $20 $1,304
51,542
kWh
$607
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,175 $6,855 $3,165
125,061
kWh
$2,010
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,096 $2,988 $3,471
137,223
kWh
$1,625
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $1,196 $664 $816
32,249
kWh
$380
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $267,824 $500,000 $(-14,839.0)
(-586,535)
kWh
$(-6,912.0)
-
kW-mo/yr
$289,575
-
MMBtu
TOTAL RECOMMENDED $288,816 $511,110 $(-889.0)
(-35,334)
kWh
$130
-
kW-mo/yr
$289,575
-
MMBtu
TOTAL IMPLEMENTED $8,810 $1,247 $6,010
237,375
kWh
$2,800
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs