Assessment Year | 2003 |
---|---|
Principal Product | Switch Gears |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 715 |
Plant Area |
450,000
ft2
|
Annual Production | 14,344
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $329,970 | 13,511,400 |
kWh
|
$0.024 |
Electricity Demand | $161,229 | 29,604 |
kW-mo/yr
|
$5.45 |
Natural Gas | $292,190 | 60,094 |
MMBtu
|
$4.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,559 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,109 | $783 |
$1,462
60,657
kWh
|
$647
-
kW-mo/yr
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $511 | $34 |
$354
14,688
kWh
|
$157
-
kW-mo/yr
|
|
03 | 2.4323: Use optimum size and capacity equipment | $1,475 | $570 |
$1,475
61,200
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,973 | $16,562 |
$4,832
200,494
kWh
|
$2,141
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,303 | $4,835 |
$7,832
324,972
kWh
|
$3,471
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $614 | $399 |
$614
25,459
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $174 | $514 |
$121
5,037
kWh
|
$53
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $23,159 | $23,697 |
$16,690
692,507
kWh
|
$6,469
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $20,559 | $22,694 |
$14,247
591,160
kWh
|
$6,312
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs