Assessment Year | 2003 |
---|---|
Principal Product | Fasteners and urethane protective products |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 16,800,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,839 | 8,922,000 |
kWh
|
$0.022 |
Electricity Demand | $221,244 | 16,740 |
kW-mo/yr
|
$13.22 |
Natural Gas | $67,753 | 18,063 |
MMBtu
|
$3.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,996 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,747 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,362 | $29,292 |
$4,261
191,932
kWh
|
$3,101
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,338 | $5,828 |
$1,261
56,806
kWh
|
$1,077
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $214 | $266 |
$214
9,645
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $807 | $25 |
$467
21,054
kWh
|
$340
-
kW-mo/yr
|
- | |
05 | 2.3191: Use demand controller or load shedder | $12,468 | $7,349 | - |
$12,468
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $204 | - |
$118
5,312
kWh
|
$86
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $523 | - |
$303
13,628
kWh
|
$220
-
kW-mo/yr
|
- | |
08 | 2.1133: Adjust burners for efficient operation | $2,267 | $1,000 | - | - |
$2,267
-
MMBtu
|
|
09 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,994 | $2,000 |
$862
38,808
kWh
|
$1,132
-
kW-mo/yr
|
- | |
10 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $7,819 | $16,000 |
$1,026
46,231
kWh
|
- |
$6,793
-
MMBtu
|
|
TOTAL RECOMMENDED | $35,996 | $61,760 |
$8,512
383,416
kWh
|
$18,424
-
kW-mo/yr
|
$9,060
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,747 | $13,443 |
$1,896
85,391
kWh
|
$13,851
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs