ITAC Assessment: IA0267
ITAC logo
ITAC Assessment: IA0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product plastic bottles and caps
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 111,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,027 9,146,000
kWh
Electricity Demand $123,404 17,424
kW-mo/yr
Natural Gas $9,102 1,393
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $688,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,910 $120 $3,459
145,350
kWh
$1,451
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $4,711 $2,000 $3,317
139,371
kWh
$1,394
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $4,261 $65 $3,001
126,096
kWh
$1,260
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,199 - $2,961
124,392
kWh
$1,238
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,590 $4,978 $833
34,980
kWh
$757
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $571 $1,397 $571
23,945
kWh
- -
07 4.441: Install automatic packing equipment $511,200 $300,000 - - $511,200
08 4.441: Install automatic packing equipment $127,800 $107,000 - - $127,800
09 4.441: Install automatic packing equipment $18,225 $42,125 - - $18,225
10 4.441: Install automatic packing equipment $10,872 $7,000 - - $10,872
TOTAL RECOMMENDED $688,339 $464,685 $14,142
594,134
kWh
$6,100
-
kW-mo/yr
$668,097
TOTAL IMPLEMENTED $9,621 $2,120 $6,776
284,721
kWh
$2,845
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs