Assessment Year | 2000 |
---|---|
Principal Product | cardboard containers |
NAICS |
n/a
|
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $5 M to 10M |
# of Employees | 125 |
Plant Area |
275,000
ft2
|
Annual Production | 9,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,141 | 1,811,841 |
kWh
|
$0.037 |
Electricity Demand | $67,952 | 9,024 |
kW-mo/yr
|
$7.53 |
Natural Gas | $9,857 | 2,152 |
MMBtu
|
$4.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,381 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,858 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.322: Eliminate old stock and modify inventory control | $19,500 | $22,000 | - | - | - | $19,500 | |
02 | 4.441: Install automatic packing equipment | $18,200 | $10,275 | - | - | $18,200 | - | |
03 | 2.4133: Use most efficient type of electric motors | $3,060 | - |
$2,193
60,375
kWh
|
$867
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,799 | $202 |
$2,723
74,736
kWh
|
$1,076
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,999 | - |
$1,431
39,273
kWh
|
$568
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $445 | $25 |
$318
8,792
kWh
|
$127
-
kW-mo/yr
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $378 | $56 |
$279
7,620
kWh
|
$99
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $47,381 | $32,558 |
$6,944
190,796
kWh
|
$2,737
-
kW-mo/yr
|
$18,200 | $19,500 | ||
TOTAL IMPLEMENTED | $8,858 | $202 |
$6,347
174,384
kWh
|
$2,511
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs