Assessment Year | 2000 |
---|---|
Principal Product | athletic socks |
NAICS |
n/a
|
SIC | 2252: Hosiery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
150,000
ft2
|
Annual Production | 19,200,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,200 | 6,856,975 |
kWh
|
$0.028 |
Electricity Demand | $65,820 | 16,416 |
kW-mo/yr
|
$4.01 |
Natural Gas | $88,445 | 25,000 |
MMBtu
|
$3.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,527 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,163 | $616 |
$3,267
116,354
kWh
|
$896
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,274 | $50 |
$999
35,463
kWh
|
$275
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,742 | - |
$1,366
48,652
kWh
|
$376
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,660 | $2,661 |
$2,087
74,150
kWh
|
$573
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,229 | - |
$964
34,291
kWh
|
$265
-
kW-mo/yr
|
- | - | |
06 | 3.4113: Treat and reuse rinse waters | $4,393 | $4,718 | - | - |
$4,393
-
Tgal
|
- | |
07 | 4.211: Consider use / purchase of bulk materials where possible | $3,420 | $2,950 | - | - | - | $3,420 | |
TOTAL RECOMMENDED | $18,881 | $10,995 |
$8,683
308,910
kWh
|
$2,385
-
kW-mo/yr
|
$4,393
-
Tgal
|
$3,420 | ||
TOTAL IMPLEMENTED | $11,527 | $5,334 |
$5,597
199,297
kWh
|
$1,537
-
kW-mo/yr
|
$4,393
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs