ITAC Assessment: IA0236
ITAC logo
ITAC Assessment: IA0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product custom steel plate
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 336,000
ft2
Annual Production 500
ton
Production Hrs. Annual 4,160
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,717 3,869,871
kWh
Electricity Demand $86,557 12,432
kW-mo/yr
Natural Gas $76,992 22,355
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,665 $16,153 $2,226
88,218
kWh
$2,439
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,409 $1,248 $1,897
75,322
kWh
$1,512
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,131 $394 $1,187
47,186
kWh
$944
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $455 $200 $455
18,171
kWh
- - - -
05 3.8143: Recycle cleaning solvent and reuse $8,966 $7,853 - $(-418.0)
-
kW-mo/yr
$7,859
-
gal
$(-567.0) $2,092
TOTAL RECOMMENDED $19,626 $25,848 $5,765
228,897
kWh
$4,477
-
kW-mo/yr
$7,859
-
gal
$(-567.0) $2,092
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs