Assessment Year | 1999 |
---|---|
Principal Product | labels |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 119 |
Plant Area |
112,683
ft2
|
Annual Production | 20,000
thousand feet
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,889 | 4,235,932 |
kWh
|
$0.025 |
Electricity Demand | $91,987 | 13,140 |
kW-mo/yr
|
$7.00 |
Natural Gas | $16,457 | 4,825 |
MMBtu
|
$3.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,324 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,333 | $113 |
$688
27,843
kWh
|
$5,645
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,966 | $23,033 |
$2,925
117,819
kWh
|
$2,041
-
kW-mo/yr
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $5,948 | $4,194 |
$3,546
471,278
kWh
|
$2,402
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,489 | $2,328 |
$1,489
60,082
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $624 | $215 |
$372
14,947
kWh
|
$252
-
kW-mo/yr
|
- | - | |
06 | 3.1194: Use automatic flow control | $57,964 | $70,000 |
$4,390
177,022
kWh
|
$2,974
-
kW-mo/yr
|
$16,200 | $34,400 | |
TOTAL RECOMMENDED | $77,324 | $99,883 |
$13,410
868,991
kWh
|
$13,314
-
kW-mo/yr
|
$16,200 | $34,400 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs