| Assessment Year | 1999 |
|---|---|
| Principal Product | tanned leather hides |
| NAICS |
n/a
|
| SIC | 3111: Leather Tanning and Finishing |
| Sales Range | $10 M to 50M |
| # of Employees | 210 |
| Plant Area |
125,000
ft2
|
| Annual Production | 20,000
pieces
|
| Production Hrs. Annual | 6,468
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $277,000 | 12,586,753 |
kWh
|
$0.022 |
| Electricity Demand | $195,500 | 24,192 |
kW-mo/yr
|
$8.08 |
| Natural Gas | $413,400 | 103,097 |
MMBtu
|
$4.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,567 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,069 | - |
$2,433
110,492
kWh
|
$1,636
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $856 | $3,093 |
$512
23,154
kWh
|
$344
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $278 | $466 |
$278
12,603
kWh
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,516 | $100 |
$1,540
70,047
kWh
|
$976
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,567 | $169 |
$936
42,497
kWh
|
$631
-
kW-mo/yr
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $791 | $300 |
$471
21,395
kWh
|
$320
-
kW-mo/yr
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $8,048 | - |
$4,929
224,209
kWh
|
$3,119
-
kW-mo/yr
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,439 | $2,000 | - | - |
$4,439
-
MMBtu
|
- | |
| 09 | 2.1213: Direct warmest air to combustion intake | $1,231 | $800 | - | - |
$1,231
-
MMBtu
|
- | |
| 10 | 4.425: Eliminate/reduce redundant inspections | $20,145 | $500 | - | - | - | $20,145 | |
| TOTAL RECOMMENDED | $43,940 | $7,428 |
$11,099
504,397
kWh
|
$7,026
-
kW-mo/yr
|
$5,670
-
MMBtu
|
$20,145 | ||
| TOTAL IMPLEMENTED | $1,567 | $169 |
$936
42,497
kWh
|
$631
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs