Assessment Year | 1999 |
---|---|
Principal Product | waste management vehicles |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
100,000
ft2
|
Annual Production | 364
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,888 | 882,767 |
kWh
|
$0.059 |
Natural Gas | $31,757 | 6,518 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,781 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $420 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,310 | $14,754 |
$6,310
107,562
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,756 | $20,756 |
$4,756
81,184
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $2,081 | $2,195 |
$2,081
35,463
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $876 | $87 | - |
$876
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $151 | - |
$151
2,638
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $420 | $272 |
$420
7,034
kWh
|
- | - | |
07 | 3.7198: Reduce / eliminate use of disposable product | $3,187 | $2,656 | - | - |
$3,187
-
lb
|
|
TOTAL RECOMMENDED | $17,781 | $40,720 |
$13,718
233,881
kWh
|
$876
-
MMBtu
|
$3,187
-
lb
|
||
TOTAL IMPLEMENTED | $420 | $272 |
$420
7,034
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs