ITAC Assessment: IA0213
ITAC logo
ITAC Assessment: IA0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product steam turbines
NAICS
n/a
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 134,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,001 3,627,198
kWh
Electricity Demand $62,118 9,936
kW-mo/yr
Natural Gas $85,006 28,841
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,464 $6,607 $617
26,964
kWh
$847
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $659 $50 $480
21,102
kWh
$179
-
kW-mo/yr
- - -
03 2.1213: Direct warmest air to combustion intake $235 $688 - - $235
-
MMBtu
- -
04 2.7135: Install occupancy sensors $125 $466 $125
5,569
kWh
- - - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,000 $2,000 - - - - $4,000
06 3.4157: Replace water cooling on processes with air cooling $2,978 $150 - - - $2,978
-
Tgal
-
TOTAL RECOMMENDED $9,461 $9,961 $1,222
53,635
kWh
$1,026
-
kW-mo/yr
$235
-
MMBtu
$2,978
-
Tgal
$4,000
TOTAL IMPLEMENTED $2,123 $6,657 $1,097
48,066
kWh
$1,026
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs