ITAC Assessment: IA0199
ITAC logo
ITAC Assessment: IA0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product plastic sheets and bags
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 93,620
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $397,076 13,628,957
kWh
Electricity Demand $224,008 20,784
kW-mo/yr
Natural Gas $67,688 13,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,651

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.6218: Turn off equipment when not in use $15,640 - $10,297
354,045
kWh
$5,343
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,599 $52 $4,206
144,490
kWh
$2,393
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,959 $7,526 $1,523
52,462
kWh
$1,436
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,818 $760 $1,197
41,032
kWh
$621
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,594 $1,196 $1,051
36,049
kWh
$543
-
kW-mo/yr
-
06 4.431: Train operators for maximum operating efficiency $1,035 $144 - - $1,035
-
lb
07 2.7135: Install occupancy sensors $464 $466 $464
16,120
kWh
- -
TOTAL RECOMMENDED $30,109 $10,144 $18,738
644,198
kWh
$10,336
-
kW-mo/yr
$1,035
-
lb
TOTAL IMPLEMENTED $25,651 $2,008 $16,751
575,616
kWh
$8,900
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs