ITAC Assessment: IA0195
ITAC logo
ITAC Assessment: IA0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel Castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 148,000
ft2
Annual Production 6,000
ton
Production Hrs. Annual 6,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,942 12,726,260
kWh
Electricity Demand $407,061 61,812
kW-mo/yr
Natural Gas $180,513 58,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,328

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.4111: Use closed cycle process to minimize waste water production $19,062 $6,300 $(-96.0)
(-3,810)
kWh
$(-89.0)
-
kW-mo/yr
$19,247
-
Tgal
- -
02 2.3191: Use demand controller or load shedder $15,886 $2,000 - $15,886
-
kW-mo/yr
- - -
03 4.423: Move product using mechanical means $15,300 $8,676 - - - - $15,300
04 3.5313: Increase amount of waste recovered for resale $2,783 $500 - - - $2,783
-
lb
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,336 $130 $1,510
60,375
kWh
$826
-
kW-mo/yr
- - -
06 2.4311: Recover mechanical energy $2,321 $3,413 $1,137
45,428
kWh
$1,184
-
kW-mo/yr
- - -
07 3.5313: Increase amount of waste recovered for resale $940 $500 - - - $940
-
lb
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $844 $3,478 $359
14,361
kWh
$485
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $800 $899 $800
26,671
kWh
- - - -
TOTAL RECOMMENDED $60,272 $25,896 $3,710
143,025
kWh
$18,292
-
kW-mo/yr
$19,247
-
Tgal
$3,723
-
lb
$15,300
TOTAL IMPLEMENTED $43,328 $12,843 $2,551
101,993
kWh
$17,807
-
kW-mo/yr
$19,247
-
Tgal
$3,723
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs