ITAC Assessment: IA0194
ITAC logo
ITAC Assessment: IA0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product tire and industrial chains
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 325,000
ft2
Annual Production 19,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,270 13,729,777
kWh
Electricity Demand $209,493 27,912
kW-mo/yr
Natural Gas $235,176 81,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,107 $21,359 $9,517
303,048
kWh
$3,590
-
kW-mo/yr
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,917 $3,000 - - $4,917
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,197 $4,877 $1,123
35,756
kWh
$1,074
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $1,500 $1,695 - - $1,500
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $877 $15 $635
20,223
kWh
$242
-
kW-mo/yr
- - -
06 4.441: Install automatic packing equipment $74,880 $52,000 - - - $74,880 -
07 2.3137: Use power during off-peak periods $11,884 - - - - $(-986.0) $12,870
TOTAL RECOMMENDED $109,362 $82,946 $11,275
359,027
kWh
$4,906
-
kW-mo/yr
$6,417
-
MMBtu
$73,894 $12,870
TOTAL IMPLEMENTED $15,304 $26,236 $10,640
338,804
kWh
$4,664
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs