Assessment Year | 1997 |
---|---|
Principal Product | animal vaccines |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
39,000
ft2
|
Annual Production | 32,000,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,262 | 3,362,837 |
kWh
|
$0.046 |
Electricity Demand | $19,420 | 7,824 |
kW-mo/yr
|
$2.48 |
Natural Gas | $56,781 | 13,920 |
MMBtu
|
$4.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,304 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Water Consumption Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $6,078 | $68,000 |
$1,892
41,325
kWh
|
$158
-
kW-mo/yr
|
$4,028
-
MMBtu
|
- | - | - | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,353 | $3,856 |
$1,050
22,860
kWh
|
$303
-
kW-mo/yr
|
- | - | - | - | - | - | - | - | |
03 | 2.7135: Install occupancy sensors | $1,081 | $798 |
$1,081
23,740
kWh
|
- | - | - | - | - | - | - | - | - | |
04 | 3.4115: Recover and reuse cooling water | $6,010 | $5,809 |
$(-21.0)
(-586)
kWh
|
$(-4.0)
-
kW-mo/yr
|
- |
$2,854
-
Tgal
|
- | - | - | - |
$3,181
-
Tgal
|
- | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $4,639 | $8,400 | - | - | - | - |
$2,516
-
lb
|
$(-127.0) | - | - | - | $2,250 | |
06 | 3.6192: Use a less expensive method of waste removal | $2,112 | $600 | - | - | - | - |
$2,112
-
lb
|
- | - | - | - | - | |
07 | 3.5311: Recover and reuse waste material | $315 | - | - | - | - | - | - | - | - | $315 | - | - | |
08 | 2.8113: Purchase gas directly from a contract gas supplier | $17,122 | $4,200 | - | - | - | - | - | - | $17,122 | - | - | - | |
09 | 4.441: Install automatic packing equipment | $11,440 | $50,000 | - | - | - | - | - | $11,440 | - | - | - | - | |
TOTAL RECOMMENDED | $50,150 | $141,663 |
$4,002
87,339
kWh
|
$457
-
kW-mo/yr
|
$4,028
-
MMBtu
|
$2,854
-
Tgal
|
$4,628
-
lb
|
$11,313 | $17,122 | $315 |
$3,181
-
Tgal
|
$2,250 | ||
TOTAL IMPLEMENTED | $31,304 | $85,056 |
$2,942
64,185
kWh
|
$461
-
kW-mo/yr
|
$4,028
-
MMBtu
|
- |
$4,628
-
lb
|
$(-127.0) | $17,122 | - | - | $2,250 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Water Consumption Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs