ITAC Assessment: IA0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product plastic containers and lids
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 101,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,816 13,785,170
kWh
Electricity Demand $274,808 28,752
kW-mo/yr
Natural Gas $11,884 2,789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,179

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,618 $8,704 $2,203
95,838
kWh
$1,415
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $242 $314 $160
7,034
kWh
$82
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $27,255 $27,255 - - - - $27,255
04 3.4116: Meter recycled water (to reduce sewer charges) $3,924 $300 - - $3,924
-
Tgal
- -
05 3.5217: Reuse / recycle/ sell paper products $240 - - - - $240
-
lb
-
TOTAL RECOMMENDED $35,279 $36,573 $2,363
102,872
kWh
$1,497
-
kW-mo/yr
$3,924
-
Tgal
$240
-
lb
$27,255
TOTAL IMPLEMENTED $31,179 $27,555 - - $3,924
-
Tgal
- $27,255
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs