ITAC Assessment: IA0155
ITAC logo
ITAC Assessment: IA0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product hydraulic articulating cranes and truck bodies
NAICS
n/a
SIC 3536: Overhead Traveling Cranes, Hoists, and Monorail Systems
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area 300,000
ft2
Annual Production 13,060
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,688 5,270,223
kWh
Electricity Demand $154,175 10,500
kW-mo/yr
Natural Gas $81,533 31,390
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,129

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,243 $213 $2,822
117,526
kWh
$3,421
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,287 $25 $399
16,706
kWh
$888
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,887 $15,222 $1,692
70,633
kWh
$1,195
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,123 $2,510 $956
39,859
kWh
$1,167
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,266 $35,668 $2,832
118,113
kWh
$3,434
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $1,124 $4,081 $606
25,205
kWh
$518
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $210 $480 $88
3,517
kWh
$122
-
kW-mo/yr
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,030 $5,000 - - - $5,030
09 3.1191: Change procedures / equipment / operating conditions $594 $2,900 - - $594
-
lb
-
TOTAL RECOMMENDED $25,764 $66,099 $9,395
391,559
kWh
$10,745
-
kW-mo/yr
$594
-
lb
$5,030
TOTAL IMPLEMENTED $16,129 $38,896 $7,097
295,721
kWh
$9,032
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs