Assessment Year | 1996 |
---|---|
Principal Product | dairy products |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
65,000
ft2
|
Annual Production | 65,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,939 | 3,310,668 |
kWh
|
$0.023 |
Electricity Demand | $81,648 | 6,864 |
kW-mo/yr
|
$11.90 |
Electricity Fees | $10,077 | - |
|
- |
Natural Gas | $88,540 | 22,023 |
MMBtu
|
$4.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,478 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4111: Use closed cycle process to minimize waste water production | $8,102 | $2,678 | - | - | - | - |
$8,102
-
Tgal
|
|
02 | 2.2425: Use flue gases to heat process or service water | $5,206 | $22,090 | - | - | - |
$5,206
-
MMBtu
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $1,805 | $4,646 |
$1,150
57,444
kWh
|
$655
-
kW-mo/yr
|
- | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,758 | $2,000 | - | - | - |
$3,758
-
MMBtu
|
- | |
05 | 3.4111: Use closed cycle process to minimize waste water production | $3,111 | $354 | - | - | - | - |
$3,111
-
Tgal
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,949 | $4,617 |
$1,870
93,494
kWh
|
$1,079
-
kW-mo/yr
|
- | - | - | |
07 | 4.811: Demolish old building to reduce tax and insurance bills | $2,570 | $250 | - | - | $2,570 | - | - | |
08 | 2.2628: Utilize a less expensive cooling method | $1,124 | $4,500 |
$842
36,635
kWh
|
$282
-
kW-mo/yr
|
- | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,892 | $2,167 |
$1,198
59,789
kWh
|
$694
-
kW-mo/yr
|
- | - | - | |
10 | 2.1213: Direct warmest air to combustion intake | $659 | $659 | - | - | - |
$659
-
MMBtu
|
- | |
11 | 3.4154: Eliminate leaks in water lines and valves | $243 | $250 | - | - | - | - |
$243
-
Tgal
|
|
TOTAL RECOMMENDED | $31,419 | $44,211 |
$5,060
247,362
kWh
|
$2,710
-
kW-mo/yr
|
$2,570 |
$9,623
-
MMBtu
|
$11,456
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,478 | $9,824 |
$1,150
57,444
kWh
|
$655
-
kW-mo/yr
|
$2,570 |
$3,758
-
MMBtu
|
$8,345
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs