ITAC Assessment: IA0150
ITAC logo
ITAC Assessment: IA0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Edible Stocks and Broths
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 64,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,740 4,458,968
kWh
Electricity Demand $32,297 10,272
kW-mo/yr
Electricity Fees $785 -
Natural Gas $335,200 172,147
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,888 $1,000 - - $6,888
-
MMBtu
- -
02 2.1213: Direct warmest air to combustion intake $850 $165 - - $850
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $405 $1,186 $320
15,533
kWh
$85
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $350 $229 $271
13,189
kWh
$79
-
kW-mo/yr
- - -
05 4.652: Replace existing equipment with more suitable substitutes $356 - - - - - $356
06 3.4111: Use closed cycle process to minimize waste water production $2,520 $2,500 - - - $2,520
-
Tgal
-
TOTAL RECOMMENDED $11,369 $5,080 $591
28,722
kWh
$164
-
kW-mo/yr
$7,738
-
MMBtu
$2,520
-
Tgal
$356
TOTAL IMPLEMENTED $10,964 $3,894 $271
13,189
kWh
$79
-
kW-mo/yr
$7,738
-
MMBtu
$2,520
-
Tgal
$356
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs