ITAC Assessment: IA0139
ITAC logo
ITAC Assessment: IA0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product submersible pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $50
M
to 100
M
# of Employees 281
Plant Area 150,375
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 5,148
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,394 4,911,782
kWh
Electricity Demand $95,997 11,976
kW-mo/yr
Natural Gas $44,952 10,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,299

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,039 $17,393 $5,115
155,041
kWh
$2,924
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $2,324 $1,613 $1,459
44,256
kWh
$865
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $937 $1,054 $608
18,464
kWh
$329
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,406 $215 $2,376
72,098
kWh
$1,030
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,666 $25 $1,104
33,411
kWh
$562
-
kW-mo/yr
- -
06 2.8113: Purchase gas directly from a contract gas supplier $17,416 $4,200 - - - $17,416
07 3.7198: Reduce / eliminate use of disposable product $1,177 $1,350 - - $1,177
-
lb
-
08 3.3126: Use absorption, extraction to remove contaminants $3,934 $1,018 - - $3,934
-
lb
-
TOTAL RECOMMENDED $38,899 $26,868 $10,662
323,270
kWh
$5,710
-
kW-mo/yr
$5,111
-
lb
$17,416
TOTAL IMPLEMENTED $33,299 $25,825 $9,558
289,859
kWh
$5,148
-
kW-mo/yr
$1,177
-
lb
$17,416
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs