Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product aluminum cans and ends
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $5
M
to 10
M
# of Employees 96
Plant Area 105,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,032 6,840,563
kWh
Natural Gas $11,690 2,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,304 $79,400 $11,304
247,069
kWh
02 2.4133: Use most efficient type of electric motors $12,241 $1,577 $12,241
267,585
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,217 $1,816 $4,217
92,321
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,911 $520 $1,911
41,911
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,877 $8,050 $2,877
63,013
kWh
06 2.7135: Install occupancy sensors $203 $539 $203
4,396
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $144 $270 $144
3,224
kWh
TOTAL RECOMMENDED $32,897 $92,172 $32,897
719,519
kWh
TOTAL IMPLEMENTED $23,689 $81,247 $23,689
517,878
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs