ITAC Assessment: IA0094
ITAC logo
ITAC Assessment: IA0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product automotive stampings
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 75,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,629 3,893,025
kWh
Natural Gas $5,976 1,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,255 $315 $10,255
161,196
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,502 $1,430 $4,502
70,047
kWh
-
03 2.7135: Install occupancy sensors $2,191 $1,224 $2,191
33,998
kWh
-
04 2.4133: Use most efficient type of electric motors $2,523 $10,378 $2,523
39,566
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,916 $390 $4,279
67,409
kWh
$(-1,363.0)
-
MMBtu
06 2.2511: Insulate bare equipment $184 $68 $184
2,931
kWh
-
TOTAL RECOMMENDED $22,571 $13,805 $23,934
375,147
kWh
$(-1,363.0)
-
MMBtu
TOTAL IMPLEMENTED $17,280 $12,123 $17,280
270,809
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs