Assessment Year | 1994 |
---|---|
Principal Product | castings |
NAICS |
n/a
|
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
400,000
ft2
|
Annual Production | 18,600
ton
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,193,662 | 36,921,747 |
kWh
|
$0.032 |
Natural Gas | $310,084 | 79,316 |
MMBtu
|
$3.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,906 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $92,193 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $64,093 | $4,700 | - | $64,093 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,691 | $9,871 |
$10,691
272,274
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $527 | $1,386 |
$527
12,603
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,200 | $150 |
$8,200
275,791
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,028 | $40 |
$1,028
24,326
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $8,181 | $1,168 |
$8,181
193,728
kWh
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $805 | $665 |
$805
20,223
kWh
|
- | |
08 | 2.3132: Recharge batteries on during off-peak demand periods | $381 | - |
$381
-
kWh
|
- | |
TOTAL RECOMMENDED | $93,906 | $17,980 |
$29,813
798,945
kWh
|
$64,093 | ||
TOTAL IMPLEMENTED | $92,193 | $15,929 |
$28,100
766,119
kWh
|
$64,093 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs