ITAC Assessment: IA0081
ITAC logo
ITAC Assessment: IA0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area 56,950
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,081 1,489,449
kWh
Natural Gas $2,289 487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2628: Utilize a less expensive cooling method $4,823 $7,982 $4,823
58,324
kWh
-
02 2.4133: Use most efficient type of electric motors $4,535 $6,200 $4,535
67,116
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,455 $2,215 $4,455
60,375
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,938 $2,400 $1,938
14,361
kWh
-
05 2.7135: Install occupancy sensors $289 $462 $289
2,638
kWh
-
06 2.7122: Disconnect ballasts $201 $494 $201
1,465
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $311 $25 $311
4,689
kWh
-
08 2.7491: Insulate glazing, walls, ceilings, and roofs $294 $786 - $294
-
MMBtu
TOTAL RECOMMENDED $16,846 $20,564 $16,552
208,968
kWh
$294
-
MMBtu
TOTAL IMPLEMENTED $14,619 $17,702 $14,325
191,969
kWh
$294
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs