ITAC Assessment: IA0078
ITAC logo
ITAC Assessment: IA0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product centrifugal pumps
NAICS
n/a
SIC 3594: Fluid Power Pumps and Motors
Sales Range $10
M
to 50
M
# of Employees 119
Plant Area 95,300
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,705 1,865,475
kWh
Natural Gas $12,408 2,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7131: Add area lighting switches $7,178 $900 $7,178
125,733
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,127 $1,227 $7,127
124,560
kWh
-
03 2.7122: Disconnect ballasts $1,359 $983 $1,359
23,740
kWh
-
04 2.7135: Install occupancy sensors $1,226 $2,371 $1,226
21,395
kWh
-
05 2.7224: Reduce space conditioning during non-working hours $7,527 - $7,527
131,594
kWh
-
06 2.7221: Lower temperature during the winter season and vice-versa $3,695 - - $3,695
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,352 $2,218 $3,487
60,961
kWh
$(-1,135.0)
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $669 $25 $669
11,723
kWh
-
09 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $289 - $195
3,517
kWh
$94
-
MMBtu
TOTAL RECOMMENDED $31,422 $7,724 $28,768
503,223
kWh
$2,654
-
MMBtu
TOTAL IMPLEMENTED $20,874 $5,481 $17,085
298,945
kWh
$3,789
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs