| Assessment Year | 1994 |
|---|---|
| Principal Product | molded plastic parts |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
103,244
ft2
|
| Annual Production | 16,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $295,689 | 7,235,932 |
kWh
|
$0.041 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,666 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $8,897 | $18,400 |
$8,897
217,761
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $2,317 | $730 | - |
$2,317
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $467 | - |
$467
11,430
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $456 | $150 |
$456
11,137
kWh
|
- | |
| 05 | 2.7235: Install fossil fuel make-up air unit | $1,745 | $9,000 | - |
$1,745
-
MMBtu
|
|
| 06 | 2.7135: Install occupancy sensors | $1,319 | $855 |
$1,319
32,239
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,254 | $862 |
$1,254
30,774
kWh
|
- | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $212 | $70 |
$212
5,275
kWh
|
- | |
| 09 | 2.3212: Optimize plant power factor | $1,451 | $4,140 |
$1,451
-
kWh
|
- | |
| TOTAL RECOMMENDED | $18,118 | $34,207 |
$14,056
308,616
kWh
|
$4,062
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,666 | $33,257 |
$12,921
280,774
kWh
|
$1,745
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs