ITAC Assessment: IA0070
ITAC logo
ITAC Assessment: IA0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product BREAD AND BUNS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 52,000,000
lb
Production Hrs. Annual 5,590
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,616 3,687,573
kWh
Natural Gas $203,348 49,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,539

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $67,365 $4,200 - $67,365
-
MMBtu
-
02 2.4239: Eliminate or reduce compressed air usage $8,847 $1,226 $8,847
201,934
kWh
- -
03 2.2136: Install / repair insulation on steam lines $4,259 $4,469 - $4,259
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,915 $105 $4,915
112,251
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $451 $25 $451
10,258
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $407 - $1,144
26,084
kWh
- $(-737.0)
07 2.7135: Install occupancy sensors $560 $1,539 $560
12,896
kWh
- -
TOTAL RECOMMENDED $86,804 $11,564 $15,917
363,423
kWh
$71,624
-
MMBtu
$(-737.0)
TOTAL IMPLEMENTED $76,539 $8,774 $4,915
112,251
kWh
$71,624
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs