ITAC Assessment: IA0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product publishing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 20,000
ft2
Annual Production 1,650
ton
Production Hrs. Annual 7,488
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,169 754,689
kWh
Natural Gas $10,391 3,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,116 $2,000 $3,116
42,497
kWh
02 2.4221: Install compressor air intakes in coolest locations $71 $50 $71
879
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,414 $441 $1,414
19,343
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $574 $112 $574
7,913
kWh
05 2.7135: Install occupancy sensors $265 $414 $265
3,517
kWh
TOTAL RECOMMENDED $5,440 $3,017 $5,440
74,149
kWh
TOTAL IMPLEMENTED $5,175 $2,603 $5,175
70,632
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs