ITAC Assessment: IA0020
ITAC logo
ITAC Assessment: IA0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HYDROSTATIC TRANSMISSION
NAICS
n/a
SIC 3594: Fluid Power Pumps and Motors
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area
n/a
Annual Production 162,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $559,116 12,500,000
kWh
Natural Gas $63,848 23,870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,833 $551 $6,386
143,025
kWh
- $(-553.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $223 $412 $303
6,741
kWh
- $(-80.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $607 $1,000 $607
13,482
kWh
- -
04 2.2437: Recover waste heat from equipment $2,076 $3,000 - $2,076
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $452 $8,900 $452
10,258
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $946 $2,192 $946
21,102
kWh
- -
TOTAL RECOMMENDED $10,137 $16,055 $8,694
194,608
kWh
$2,076
-
MMBtu
$(-633.0)
TOTAL IMPLEMENTED $6,285 $9,451 $6,838
153,283
kWh
- $(-553.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs