ITAC Assessment: IA0011
ITAC logo
ITAC Assessment: IA0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 540,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,823 3,383,060
kWh
Natural Gas $100,532 38,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2124: Install de-aerator in place of condensate tank $57,580 $70,000 - $57,580
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $887 $1,592 $887
16,706
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $727 - $815
15,240
kWh
- $(-88.0)
04 2.4239: Eliminate or reduce compressed air usage $622 - $622
11,723
kWh
- -
TOTAL RECOMMENDED $59,816 $71,592 $2,324
43,669
kWh
$57,580
-
MMBtu
$(-88.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs