ITAC Assessment: IA0005
ITAC logo
ITAC Assessment: IA0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DAIRY DESSERTS
NAICS
n/a
SIC 2032: Canned Specialties
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area
n/a
Annual Production 8,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $806,822 21,403,283
kWh
Natural Gas $357,402 128,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2447: Heat water with exhaust heat $10,300 $25,000 - $10,300
-
MMBtu
02 2.4133: Use most efficient type of electric motors $4,463 $9,202 $4,463
118,406
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,471 - $11,471
304,513
kWh
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $24,575 $13,000 $24,575
652,403
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $13,435 $5,300 $13,435
356,682
kWh
-
TOTAL RECOMMENDED $64,244 $52,502 $53,944
1,432,004
kWh
$10,300
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs