ITAC Assessment: HO0217
ITAC logo
ITAC Assessment: HO0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Bags
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 30,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,929 3,115,768
kWh
Electricity Demand $53,568 5,236
kW-mo/yr
Electricity Fees $(-26,525.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,121 $6,030 n/a $5,197
65,944
kWh
$924
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $725 $200 n/a $725
9,086
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $5,922 $15,200 n/a $5,922
75,029
kWh
- - - -
04 2.2511: Insulate bare equipment $8,538 $1,008 n/a $8,538
108,148
kWh
- - - -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $60,015 $400,000 n/a - $276,861
-
kW-mo/yr
$(-216,846.0)
-
MMBtu
- -
06 4.424: Improve space comfort conditioning $4,365 $500 n/a - - - - $4,365
07 3.5313: Increase amount of waste recovered for resale $540 $100 n/a - - - $540
-
lb
-
TOTAL RECOMMENDED $86,226 $423,038 $20,382
258,207
kWh
$277,785
-
kW-mo/yr
$(-216,846.0)
-
MMBtu
$540
-
lb
$4,365
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs