ITAC Assessment: HO0213
ITAC logo
ITAC Assessment: HO0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Power Supplies
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 36,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,956 924,971
kWh
Electricity Demand $97,239 4,278
kW-mo/yr
Electricity Fees $6,213 -
Natural Gas $26,246 3,147
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,698 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $931 - $931
16,706
kWh
- - - -
02 2.6242: Minimize operation of equipment maintained in standby condition $400 - $400
7,034
kWh
- - - -
03 2.7229: Air condition only space necessary $2,807 $5,000 $925
16,413
kWh
$1,882
-
kW-mo/yr
- - -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,786 $2,500 $2,420
82,063
kWh
$366
-
kW-mo/yr
- - -
05 4.321: Optimize production lot sizes and inventories $3,750 $5,000 - - - - $3,750
06 4.111: Add equipment/ operators to reduce production bottleneck $2,813 $360 - - - - $2,813
07 4.632: Change operating conditions $899 $1,040 - - - - $899
08 3.4151: Minimize water usage $5,887 $4,200 - - $5,887
-
Tgal
- -
09 3.7131: Use a rag recycle service $425 - - - - $425
-
lb
-
TOTAL RECOMMENDED $20,698 $18,100 $4,676
122,216
kWh
$2,248
-
kW-mo/yr
$5,887
-
Tgal
$425
-
lb
$7,462
TOTAL IMPLEMENTED $931 - $931
16,706
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs