ITAC Assessment: HO0208
ITAC logo
ITAC Assessment: HO0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Stampings
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 68
Plant Area 95,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,502 828,253
kWh
Electricity Demand $48,195 5,333
kW-mo/yr
Electricity Fees $1,905 -
Natural Gas $45,359 7,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,352 $47,121 n/a $9,650
111,665
kWh
$5,702
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $2,578 $1,600 n/a $2,578
29,894
kWh
- - -
03 2.7135: Install occupancy sensors $1,190 $800 n/a $1,190
13,775
kWh
- - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $610 - n/a $610
7,034
kWh
- - -
05 2.4131: Size electric motors for peak operating efficiency $205 $500 n/a $205
2,345
kWh
- - -
06 4.512: Condense operation into one building $3,938 $8,000 n/a $2,474
28,722
kWh
$1,464
-
kW-mo/yr
- -
07 2.2223: Enhance sensitivity of temperature control and cutoff $4,536 $700 n/a - - $4,536
-
MMBtu
-
08 4.611: Begin a practice of predictive / preventative maintenance $2,340 $630 n/a - - - $2,340
09 4.632: Change operating conditions $5,720 $27,500 n/a - - - $5,720
TOTAL RECOMMENDED $36,469 $86,851 $16,707
193,435
kWh
$7,166
-
kW-mo/yr
$4,536
-
MMBtu
$8,060
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs