ITAC Assessment: HO0207
ITAC logo
ITAC Assessment: HO0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Gyroscopes
NAICS
n/a
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $50
M
to 100
M
# of Employees 420
Plant Area 132,000
ft2
Annual Production 39,000
lb
Production Hrs. Annual 5,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $880,647 15,550,997
kWh
Electricity Demand $289,416 28,192
kW-mo/yr
Electricity Fees $(-209,346.0) -
Natural Gas $301,600 57,834
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $28,880 $600 $20,960
370,457
kWh
$7,920
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $11,756 $15,000 $11,756
207,796
kWh
- -
03 2.7135: Install occupancy sensors $5,242 $10,000 $5,242
92,614
kWh
- -
04 2.6218: Turn off equipment when not in use $2,590 - $2,590
45,721
kWh
- -
05 2.7124: Make a practice of turning off lights when not needed $590 - $590
10,551
kWh
- -
06 2.6218: Turn off equipment when not in use $1,738 - $1,738
30,774
kWh
- -
07 2.2136: Install / repair insulation on steam lines $1,898 $2,625 - - $1,898
-
MMBtu
TOTAL RECOMMENDED $52,694 $28,225 $42,876
757,913
kWh
$7,920
-
kW-mo/yr
$1,898
-
MMBtu
TOTAL IMPLEMENTED $49,058 $25,600 $41,138
727,139
kWh
$7,920
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs