ITAC Assessment: HO0198
ITAC logo
ITAC Assessment: HO0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Knobs
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 20,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 2,075
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,525 842,321
kWh
Electricity Demand $30,001 4,456
kW-mo/yr
Electricity Fees $6,520 -
Natural Gas $14,305 1,658
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,422 $14,000 $3,033
36,928
kWh
$1,389
-
kW-mo/yr
- -
02 2.7124: Make a practice of turning off lights when not needed $1,100 - $1,100
13,482
kWh
- - -
03 2.4133: Use most efficient type of electric motors $234 $398 $234
2,931
kWh
- - -
04 2.3511: Use plant owned transformers or lease transformers $6,813 $27,000 - - $6,813 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,667 $400 $5,667
68,581
kWh
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $2,661 $500 $2,661
32,239
kWh
- - -
07 4.111: Add equipment/ operators to reduce production bottleneck $4,800 $5,000 - - - $4,800
08 4.111: Add equipment/ operators to reduce production bottleneck $6,228 $10,000 - - - $6,228
TOTAL RECOMMENDED $31,925 $57,298 $12,695
154,161
kWh
$1,389
-
kW-mo/yr
$6,813 $11,028
TOTAL IMPLEMENTED $25,112 $30,298 $12,695
154,161
kWh
$1,389
-
kW-mo/yr
- $11,028
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs