ITAC Assessment: HO0188
ITAC logo
ITAC Assessment: HO0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Flavors and Frangrances
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 58
Plant Area 96,800
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,865 1,854,924
kWh
Electricity Demand $27,996 4,034
kW-mo/yr
Electricity Fees $14,979 -
Natural Gas $176,726 24,481
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,001

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $11,465 $5,432 $11,465
-
MMBtu
- -
02 2.7243: Improve air circulation with destratification fans / other methods $6,007 $4,000 $6,007
-
MMBtu
- -
03 2.2136: Install / repair insulation on steam lines $1,536 $1,376 $1,536
-
MMBtu
- -
04 2.8114: Change rate schedules or other changes in utility service $8,904 $27,000 - $8,904 -
05 4.611: Begin a practice of predictive / preventative maintenance $500 $1,000 - - $500
TOTAL RECOMMENDED $28,412 $38,808 $19,008
-
MMBtu
$8,904 $500
TOTAL IMPLEMENTED $13,001 $6,808 $13,001
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs