ITAC Assessment: HO0177
ITAC logo
ITAC Assessment: HO0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product pretzels
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 125,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,158 7,450,469
kWh
Electricity Demand $84,930 13,188
kW-mo/yr
Electricity Fees $(-26,939.0) -
Natural Gas $1,152,353 272,412
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $157,217 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,566 $25,636 $6,248
122,802
kWh
$2,318
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $6,519 $9,190 $6,519
128,664
kWh
- - - -
03 2.7243: Improve air circulation with destratification fans / other methods $12,311 $1,200 - - $12,311
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $36,268 $18,500 - - $36,268
-
MMBtu
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,394 $13,600 $36,724
729,484
kWh
- $(-12,330.0)
-
MMBtu
- -
06 4.515: Install shelves / racks to utilize unused space $26,460 $103,176 - - - - $26,460
07 4.441: Install automatic packing equipment $26,460 $30,270 - - - - $26,460
08 3.1192: Reduce scrap production $15,135 $200 - - - $15,135
-
lb
-
09 3.7141: Improve cleaning efficiency by maintaining cleaning system $1,104 $535 - - - - $1,104
TOTAL RECOMMENDED $157,217 $202,307 $49,491
980,950
kWh
$2,318
-
kW-mo/yr
$36,249
-
MMBtu
$15,135
-
lb
$54,024
TOTAL IMPLEMENTED $84,819 $127,366 $43,243
858,148
kWh
- $(-19.0)
-
MMBtu
$15,135
-
lb
$26,460
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs