ITAC Assessment: HO0176
ITAC logo
ITAC Assessment: HO0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product sequins
NAICS
n/a
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 85,000
ft2
Annual Production 640,000
lb
Production Hrs. Annual 4,113
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,636 658,851
kWh
Electricity Demand $49,026 2,124
kW-mo/yr
Electricity Fees $6,690 -
Natural Gas $13,750 1,915
MMBtu
Fuel Oil #2 $5,097 625
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $913 $1,443 $913
15,826
kWh
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $640 $625 $640
65,944
kWh
- - - -
03 2.7221: Lower temperature during the winter season and vice-versa $1,026 $1,000 - $1,026
-
MMBtu
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $2,785 $6,000 $(-231.0)
(-4,103)
kWh
$1,378
-
MMBtu
$1,638
-
MMBtu
- -
05 4.632: Change operating conditions $27,147 $3,525 - - - - $27,147
06 3.5315: Lease / purchase baler; sell cardboard to recycler $9,729 $500 - - - $9,729
-
lb
-
07 3.5313: Increase amount of waste recovered for resale $4,000 $500 - - - $4,000
-
lb
-
08 3.5313: Increase amount of waste recovered for resale $12,800 $500 - - - $12,800
-
lb
-
09 3.6192: Use a less expensive method of waste removal $833 $500 - - - $833
-
lb
-
TOTAL RECOMMENDED $59,873 $14,593 $1,322
77,667
kWh
$2,404
-
MMBtu
$1,638
-
MMBtu
$27,362
-
lb
$27,147
TOTAL IMPLEMENTED $56,062 $7,593 $1,553
81,770
kWh
- - $27,362
-
lb
$27,147
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs