| Assessment Year | 1999 |
|---|---|
| Principal Product | Thermoformed plastic packaging |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
80,000
ft2
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 3,000
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $60,877 | 1,057,151 |
kWh
|
$0.058 |
| Electricity Demand | $140,545 | 6,032 |
kW-mo/yr
|
$23.30 |
| Electricity Fees | $9,168 | - |
|
- |
| Natural Gas | $211 | 11 |
MMBtu
|
$19.18 |
| Fuel Oil #2 | $24,096 | 3,988 |
MMBtu
|
$6.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,959 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,639 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,263 | $16,755 |
$1,479
24,326
kWh
|
$2,784
-
kW-mo/yr
|
- | |
| 02 | 2.2511: Insulate bare equipment | $3,201 | $168 |
$937
16,413
kWh
|
$2,264
-
kW-mo/yr
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $320 | $500 |
$320
5,569
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $800 | $300 |
$800
13,775
kWh
|
- | - | |
| 05 | 4.431: Train operators for maximum operating efficiency | $9,375 | - | - | - | $9,375 | |
| 06 | 4.521: Clear and rent existing space | $18,000 | $3,000 | - | - | $18,000 | |
| TOTAL RECOMMENDED | $35,959 | $20,723 |
$3,536
60,083
kWh
|
$5,048
-
kW-mo/yr
|
$27,375 | ||
| TOTAL IMPLEMENTED | $35,639 | $20,223 |
$3,216
54,514
kWh
|
$5,048
-
kW-mo/yr
|
$27,375 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs