Assessment Year | 1997 |
---|---|
Principal Product | Fiberglass pumps |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
48,000
ft2
|
Annual Production | 1,820
pieces
|
Production Hrs. Annual | 4,925
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,245 | 983,001 |
kWh
|
$0.065 |
Electricity Demand | $20,897 | 3,548 |
kW-mo/yr
|
$5.89 |
Electricity Fees | $417 | - |
|
- |
Natural Gas | $19,264 | 3,051 |
MMBtu
|
$6.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,083 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,357 | $5,548 |
$1,145
16,999
kWh
|
$212
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $787 | $600 |
$787
12,016
kWh
|
- | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $296 | $20 |
$242
3,810
kWh
|
$54
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,080 | $6,500 | - | - |
$7,200
-
lb
|
$(-3,120.0) | - | - | |
05 | 3.1191: Change procedures / equipment / operating conditions | $3,070 | - | - | - | - | - | - | $3,070 | |
06 | 4.211: Consider use / purchase of bulk materials where possible | $1,920 | $500 | - | - | - | - | $1,920 | - | |
TOTAL RECOMMENDED | $11,510 | $13,168 |
$2,174
32,825
kWh
|
$266
-
kW-mo/yr
|
$7,200
-
lb
|
$(-3,120.0) | $1,920 | $3,070 | ||
TOTAL IMPLEMENTED | $1,083 | $620 |
$1,029
15,826
kWh
|
$54
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs