ITAC Assessment: HO0159
ITAC logo
ITAC Assessment: HO0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fiberglass pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 48,000
ft2
Annual Production 1,820
pieces
Production Hrs. Annual 4,925
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,245 983,001
kWh
Electricity Demand $20,897 3,548
kW-mo/yr
Electricity Fees $417 -
Natural Gas $19,264 3,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,083

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,357 $5,548 $1,145
16,999
kWh
$212
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $787 $600 $787
12,016
kWh
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $296 $20 $242
3,810
kWh
$54
-
kW-mo/yr
- - - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,080 $6,500 - - $7,200
-
lb
$(-3,120.0) - -
05 3.1191: Change procedures / equipment / operating conditions $3,070 - - - - - - $3,070
06 4.211: Consider use / purchase of bulk materials where possible $1,920 $500 - - - - $1,920 -
TOTAL RECOMMENDED $11,510 $13,168 $2,174
32,825
kWh
$266
-
kW-mo/yr
$7,200
-
lb
$(-3,120.0) $1,920 $3,070
TOTAL IMPLEMENTED $1,083 $620 $1,029
15,826
kWh
$54
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs