*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Dental X-ray equipment
NAICS
n/a
SIC 3899:
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 30,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,294 456,038
kWh
Electricity Demand $61,608 2,610
kW-mo/yr
Electricity Fees $6,707 -
Natural Gas $595 50
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,739

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,364 $5,745 $439
7,620
kWh
$925
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $375 $400 $121
2,052
kWh
$254
-
kW-mo/yr
- -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,900 $6,500 - - $3,900
-
lb
-
04 4.513: Re-arrange equipment layout to reduce labor costs $31,200 $5,400 - - - $31,200
TOTAL RECOMMENDED $36,839 $18,045 $560
9,672
kWh
$1,179
-
kW-mo/yr
$3,900
-
lb
$31,200
TOTAL IMPLEMENTED $1,739 $6,145 $560
9,672
kWh
$1,179
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs