Assessment Year | 1997 |
---|---|
Principal Product | Electroplating |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 15 |
Plant Area |
11,000
ft2
|
Annual Production | 4,500
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $8,124 | 134,525 |
kWh
|
$0.060 |
Electricity Demand | $22,306 | 1,001 |
kW-mo/yr
|
$22.28 |
Electricity Fees | $2,879 | - |
|
- |
Natural Gas | $26,544 | 3,097 |
MMBtu
|
$8.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,169 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,189 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $1,488 | $2,196 | - | - |
$1,488
-
MMBtu
|
- | - | |
02 | 3.4116: Meter recycled water (to reduce sewer charges) | $6,600 | $250 | - | - | - |
$6,600
-
Tgal
|
- | |
03 | 4.513: Re-arrange equipment layout to reduce labor costs | $9,425 | $5,000 | - | - | - | - | $9,425 | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $572 | $370 | - | - |
$572
-
MMBtu
|
- | - | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,408 | $2,000 |
$2,408
-
kW-mo/yr
|
- | - | - | - | |
06 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $10,000 | $10,000 | - | - | - |
$10,000
-
Tgal
|
- | |
07 | 4.812: Apply for investment incentives | $8,676 | $100 | - | $8,676 | - | - | - | |
TOTAL RECOMMENDED | $39,169 | $19,916 |
$2,408
-
kW-mo/yr
|
$8,676 |
$2,060
-
MMBtu
|
$16,600
-
Tgal
|
$9,425 | ||
TOTAL IMPLEMENTED | $36,189 | $17,546 | - | $8,676 |
$1,488
-
MMBtu
|
$16,600
-
Tgal
|
$9,425 | ||
Yearly Savings* | Imp'd Cost* | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs