ITAC Assessment: HO0148
ITAC logo
ITAC Assessment: HO0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Electroplating
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 11,000
ft2
Annual Production 4,500
lb
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,124 134,525
kWh
Electricity Demand $22,306 1,001
kW-mo/yr
Electricity Fees $2,879 -
Natural Gas $26,544 3,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.2136: Install / repair insulation on steam lines $1,488 $2,196 - - $1,488
-
MMBtu
- -
02 3.4116: Meter recycled water (to reduce sewer charges) $6,600 $250 - - - $6,600
-
Tgal
-
03 4.513: Re-arrange equipment layout to reduce labor costs $9,425 $5,000 - - - - $9,425
04 2.2414: Use waste heat from hot flue gases to preheat $572 $370 - - $572
-
MMBtu
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,408 $2,000 $2,408
-
kW-mo/yr
- - - -
06 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $10,000 $10,000 - - - $10,000
-
Tgal
-
07 4.812: Apply for investment incentives $8,676 $100 - $8,676 - - -
TOTAL RECOMMENDED $39,169 $19,916 $2,408
-
kW-mo/yr
$8,676 $2,060
-
MMBtu
$16,600
-
Tgal
$9,425
TOTAL IMPLEMENTED $36,189 $17,546 - $8,676 $1,488
-
MMBtu
$16,600
-
Tgal
$9,425
Yearly Savings* Imp'd Cost* Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs