| Assessment Year | 1997 |
|---|---|
| Principal Product | Electroplating |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 15 |
| Plant Area |
11,000
ft2
|
| Annual Production | 4,500
lb
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $8,124 | 134,525 |
kWh
|
$0.060 |
| Electricity Demand | $22,306 | 1,001 |
kW-mo/yr
|
$22.28 |
| Electricity Fees | $2,879 | - |
|
- |
| Natural Gas | $26,544 | 3,097 |
MMBtu
|
$8.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,169 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,189 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $1,488 | $2,196 | - | - |
$1,488
-
MMBtu
|
- | - | |
| 02 | 3.4116: Meter recycled water (to reduce sewer charges) | $6,600 | $250 | - | - | - |
$6,600
-
Tgal
|
- | |
| 03 | 4.513: Re-arrange equipment layout to reduce labor costs | $9,425 | $5,000 | - | - | - | - | $9,425 | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $572 | $370 | - | - |
$572
-
MMBtu
|
- | - | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,408 | $2,000 |
$2,408
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $10,000 | $10,000 | - | - | - |
$10,000
-
Tgal
|
- | |
| 07 | 4.812: Apply for investment incentives | $8,676 | $100 | - | $8,676 | - | - | - | |
| TOTAL RECOMMENDED | $39,169 | $19,916 |
$2,408
-
kW-mo/yr
|
$8,676 |
$2,060
-
MMBtu
|
$16,600
-
Tgal
|
$9,425 | ||
| TOTAL IMPLEMENTED | $36,189 | $17,546 | - | $8,676 |
$1,488
-
MMBtu
|
$16,600
-
Tgal
|
$9,425 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs