ITAC Assessment: HO0137
ITAC logo
ITAC Assessment: HO0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic bags
NAICS
n/a
SIC 2736:
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 75,000
ft2
Annual Production 300,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,257 2,539,859
kWh
Electricity Demand $45,446 7,432
kW-mo/yr
Electricity Fees $24,618 -
Natural Gas $111,835 19,334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $561,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $561,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,704 $2,559 $1,484
17,878
kWh
$220
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $724 $610 $724
8,792
kWh
- - - -
03 2.2414: Use waste heat from hot flue gases to preheat $9,210 $2,997 - - $9,210
-
MMBtu
- -
04 3.8126: Use flue gas recuperation to reduce voc $500,000 $2,000 - - - - $500,000
05 4.513: Re-arrange equipment layout to reduce labor costs $50,000 $25,000 - - - $50,000 -
TOTAL RECOMMENDED $561,638 $33,166 $2,208
26,670
kWh
$220
-
kW-mo/yr
$9,210
-
MMBtu
$50,000 $500,000
TOTAL IMPLEMENTED $561,638 $33,166 $2,208
26,670
kWh
$220
-
kW-mo/yr
$9,210
-
MMBtu
$50,000 $500,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs