ITAC Assessment: HO0131
ITAC logo
ITAC Assessment: HO0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Artificial Joints
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 200,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $848,324 11,923,212
kWh
Electricity Demand $138,863 22,470
kW-mo/yr
Natural Gas $32,856 5,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $43,564 $111,891 $33,130
466,589
kWh
$10,434
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,164 $1,621 $1,040
14,654
kWh
$124
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $493 $400 $493
7,034
kWh
- - -
04 2.4133: Use most efficient type of electric motors $962 $1,650 $962
12,016
kWh
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $16,870 $1,110 - - $16,870
-
MMBtu
-
06 2.6242: Minimize operation of equipment maintained in standby condition $3,707 - - $3,707
-
kW-mo/yr
- -
07 4.213: Purchase material from supplier in customized packaging $51,425 - - - - $51,425
-
lb
TOTAL RECOMMENDED $118,185 $116,672 $35,625
500,293
kWh
$14,265
-
kW-mo/yr
$16,870
-
MMBtu
$51,425
-
lb
TOTAL IMPLEMENTED $962 $1,650 $962
12,016
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs