ITAC Assessment: HO0099
ITAC logo
ITAC Assessment: HO0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Envelopes
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,851 2,490,914
kWh
Natural Gas $39,430 4,518
MMBtu
Fuel Oil #2 $15,217 2,336
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,584 $11,286 $5,584
39,273
kWh
-
02 2.4133: Use most efficient type of electric motors $276 $365 $276
2,052
kWh
-
03 2.2136: Install / repair insulation on steam lines $95 $236 - $95
-
MMBtu
TOTAL RECOMMENDED $5,955 $11,887 $5,860
41,325
kWh
$95
-
MMBtu
TOTAL IMPLEMENTED $5,955 $11,887 $5,860
41,325
kWh
$95
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs